For the Saudi Water Authority, Aman Al Bilad carried out the supply and installation of electrical and low-current systems at the desalination plant project in Dammam, a critical facility that demands highly reliable operation.
Project Scope
- Power, lighting, and distribution boards.
- Earthing and electrical protection systems.
- Data and telephone systems.
- CCTV and access control systems.
- Fire alarm system.
- Testing and commissioning to approved specifications.
Project Details
- Client: Saudi Water Authority
- Sector: Public sector – desalination plants
- Location: Dammam
Learn more about our electrical services and low-voltage systems.